Sunday
Slight coating of snow on the ground. After breakfast Karen went off to Williams Lumber to buy more White Dove paint. I was sitting at the breakfast table looking out when she came in from the barn. She promptly fell flat on her face on the two steps up to the deck.Very upsetting to me. She just jumped up and said that nothing was hurt. Probably bruised knees.
More work on Sicily photos. Prepped and painted walls in gallery. Karen painted the doorway in the kitchen.

Went to Hudson Opera House for a concert of Indian music with kids from Hudson performing. Lots of fun. You can hear the kids in the background. As the music gained pace some began to dance around.
Ran into Pauline Decarmo on way home. She gave us some weed to tide us over. We also talked about her design work of UTMH.
Stopped at new store next to Vico. Strange place. The Hudson Underground. The Hudson Underground.

Beer can chicken, spinach, leftovers

Just as I noticed that the first floor joists are attached to a ledger board instead of sitting on top of the foundation Michael said that the contractor had poured the wall 18” too high. What a mess. Then Michael told the story of how the original building had collapsed because they had dug down 2 feet below the bottom of the original stone foundation. The clay subsoil gave way causing first a side wall then the front wall to slip in under the building. Big SNAFU. So far this is not an advertisement for competence on the part of the architect owners nor the contractors.




