Monday
Karen left for Cambridge before 7am She stopped at Linda Larson’s aptmnt to install Microsoft Office. She ha Soup Group.
Spent most of the morning working on UTMH matters. Ole at Verdrigris, Sam, Seth. Hoping that Ole will really focus his attention in home healthcare agency associations.

All that’s left at 6th and State St.
Walking back from meeting with Seth at One HUDSON City Centre I decided that I will stop eating anything wrapped in plastic or foil. Got to loose weight.
Also worked on a couple more Project entries. Business Cards (see below) and the library movie.
Nonfiction book club at the library. Much better and longer discussion of Bury My Heart at Wounded Knee than I much expected.
Great lamb chops. Karen chided me for not finishing AND sending letter to Walter Stitt so I did that






























Just as I noticed that the first floor joists are attached to a ledger board instead of sitting on top of the foundation Michael said that the contractor had poured the wall 18” too high. What a mess. Then Michael told the story of how the original building had collapsed because they had dug down 2 feet below the bottom of the original stone foundation. The clay subsoil gave way causing first a side wall then the front wall to slip in under the building. Big SNAFU. So far this is not an advertisement for competence on the part of the architect owners nor the contractors.