Saturday
Got up right away. Worked on a solution to mounting the video monitor between the windows on the front wall. Small technical troubles with the driver gizmo creating phantom files. Problems solved. Had to move Ruths vertically oriented video to an iPad on a back wall. 


Karen went off to exerise class at library.
Opening from 5 to 7 pm went very well. Lots of people showed up. Ted and Anne came. They know one of the exhibitors, Matt Frieburghaus, a faculty member at Marist. Sarah Sterling, Jude Silver, Michael O’Hara, Ruth ??, Dave Drake, and many others…..

Last year’s sign for the Photobook Show on Winter Walk Saturday. Changed over today.













Just as I noticed that the first floor joists are attached to a ledger board instead of sitting on top of the foundation Michael said that the contractor had poured the wall 18” too high. What a mess. Then Michael told the story of how the original building had collapsed because they had dug down 2 feet below the bottom of the original stone foundation. The clay subsoil gave way causing first a side wall then the front wall to slip in under the building. Big SNAFU. So far this is not an advertisement for competence on the part of the architect owners nor the contractors.


