Friday
Woke up at 4:30 worrying about prostate cancer threat
Spent lots of time on Feb. 2011 road trip in Projects.
Talked with David Ackerman. He sounds dreadful. Also met with Ole. Discussed good idea to create an automated confurator to connect RPM with EHR systems.
Dinner downstairs. Conversation about Karen’s upcoming speech about her book project.
Debby Mayer posted On Facebook about her local library in San Diego Reminded me that Karen and I had seen the frame of a new central library a couple of years ago Found these photos of the finished library.









Just as I noticed that the first floor joists are attached to a ledger board instead of sitting on top of the foundation Michael said that the contractor had poured the wall 18” too high. What a mess. Then Michael told the story of how the original building had collapsed because they had dug down 2 feet below the bottom of the original stone foundation. The clay subsoil gave way causing first a side wall then the front wall to slip in under the building. Big SNAFU. So far this is not an advertisement for competence on the part of the architect owners nor the contractors.


